Cargill - Ghent Harbour

Cargill - Ghent Harbour
Surface
180 m²
Construction time
4 weeks

Symobo built a high-quality modular office building for Cargill. A large meeting room of 72 m2 combined with a landscape office space of 90 m2.

Cargill insisted that the finish level matches that of a traditional building. The tiled floor (60 X 60 cm) and the suspended ceiling provide a pleasant working environment.
A pleasant indoor climate is guaranteed by an efficient energy-saving HVAC system.

To integrate the building into the environment, additional siding was applied that provides an industrial sleek look. To emphasize the flexibility of the system, we have already installed an extra partition and created 2 meeting rooms. The building system can be moved after use. Symobo provided the total solution in a flexible rental formula, including furniture.

“Symobo provided the total solution in a flexible rental formula, including furniture.”
Interested? Get in touch

Project gallery

Take a look at all the photos of this project and get inspired.